Skip to content
Kristin Carter Group

New construction tool

New build cost planner

A base price buys a house with nothing chosen yet. Between the lot premium, the structural decisions made before the slab is poured, the design center and everything you buy in the first month after closing, the number people actually spend is often well above the sign at the model home. This adds it up before you sit down with a builder.

Base and lot

The advertised starting point.

Corner, greenbelt, water or oversized lots frequently carry one.

Upgrades and selections

Where budgets usually move.

Chosen before the slab is poured and rarely changeable later.

Other costs, incentives and contingency

Everything around the build.

Pre pour, pre drywall and final are commonly done separately.

Furniture, gutters, water softener, shelving, media wiring.

Subtracted from the total.

Applied to base, lot and upgrades.

Preparing your results panel.